This is an Easee charger installed in Oxfordshire. Due to the client not having sufficient mounting space within charging distance of the car, we proposed a decorative post installation that incorporated the cable routes and allowed for a discrete charge point.
These were both installed on a large domestic site in Hertfordshire. This three-phase system was linked with the client's Solar PV arrangement to prioritize direct utilization from the Solar Array to the chargers over the internal property power consumption.
The Easee charger is one of our most frequently installed chargers, fitting various environments.
These are Hypervolt chargers, both in similar settings. The internal unit was connected to a previously installed cable, while the external unit required a new supply.
This is a three-phase installation where two units were installed following the client having their own 7kw Easee charger installed at their home.
Working in conjunction with the ChargePoint providers, this was part of the first phase of EV chargers being installed across council-owned/funded premises in Oxfordshire. We were responsible for designing the electrical installation, all groundworks, and installing the chargers that were free issued to us.
Like Commercial 1, this was part of a three-charger install, replacing one previous charger and installing two new ones. These are set up with RFID keys, allowing only key holders to collect charge as the parking is open to other industrial unit holders.
Similar to Commercials 2/3/4, this is part of Phase 1 roll out across Oxfordshire Council properties.
This is installed on an office unit, providing users charge using the Monta application, which charges the users directly for their power usage by phone.
As with Commercials 2/3/4, this install was in Witney. These are Compleo 22KW AC chargers, one of our most commonly installed chargers in the commercial sector.
This was an installation directly for the ChargePoint provider in Newcastle, replacing existing old redundant units with their new updated charge points.
This is one charger from an install across three schools during their summer holidays in 2023 where we installed 19 chargers across the sites. We were responsible for groundworks and electrical installation.
This is a project in Gloucester that we are currently working on, installing six new chargers for the clients. We produced an installation that created the least impact on the client and users of a busy premises. This has been a project in the planning for a very long time due to the sensitivity of equipment internally; however, split across two phases, we were able to provide the product for a happy client.